贪玩蓝月到底什么来头 贪玩蓝月金币怎么换rmb
New Message Message List Message Management

Name: 錢孟琪
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
對本公司的微型機組感興致,寄產品說明書.安裝細則,地址;云南省瑞麗姐告伯樂國際商城C--20錢孟琪,郵編698605
Message Time:2006-03-17 10:58:18
Answer:

Name: 莊
Tel: Email:
Theme: 電站設備
Design head(m): 8米至9米Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : 450Installed capacity: 250KW至300KW
Operation in parallel or not: 是Adress:
Your Message:
總價錢要多少
Message Time:2006-03-15 18:00:39
Answer:

Name: 彭俊
Tel: Email:
Theme:
Design head(m): 90Maximum head(m) : 90Minimum head(m):
Design flow: 0.4Minimum flow: 0.2Meters above sea level(m) : Installed capacity: 350
Operation in parallel or not: 是Adress:
Your Message:
水輪機組150kw、200kw各一套及配套電器設備一套共需資金數額。
Message Time:2006-03-15 17:02:59
Answer:

Name: 梁斌
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
Message Time:2006-03-14 13:57:55
Answer:

Name: 田貴川
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
親愛的朋友:
  您們好!
我想投資修小水電站,把發出來的電上網賣給供電局。設計水頭5米,豐水期流量為1立方米每秒左右,枯水期流量為0.4立方米每秒左右,設計流量為1~1.5立方米每秒,擬裝機容量30KW左右。我住在貴州沿河,海拔500米左右。希望你們能為我出幾套優化方案,這全套設備需要投資多少?希望能盡快回信,謝謝!
Message Time:2006-03-11 23:06:15
Answer:

ReturnFirst PagePrevious PageNext PageLast Page Page:90/154


Contact:Yang Guangping Telephone: (86-833)5544996 13990613689 Fax: (0833)5544996 Email:yanggp@163.com

Address: No. 28, 43 Hongchun Road, Emeishan, Sichuan Province. Zip Code: 614200

贪玩蓝月金币怎么换rmb 华为5g短码赚钱吗 外汇日内短线赚钱吗 省钱快报能赚钱嘛 公司股东私人给公司公户赚钱 旧家电回收赚钱么 有什么可以赚钱的APP或游戏 魔兽世界7.30赚钱 剪辑什么赚钱 GTA5线下任务做完怎么赚钱 梦幻怎么卖东西赚钱吗 创作歌曲发到网上下载赚钱吗 app上线赚钱方案 搞快递站怎么赚钱 小红书黑卡代下单赚钱 网游赚钱 贴吧 在家干啥微商赚钱