贪玩蓝月装备排行 贪玩蓝月金币怎么换rmb
New Message Message List Message Management

Name: 郭秋菊
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
我咨詢貴廠:將興建一座水頭200米,流量0.15M3/秒.集雨面積4平方公里的水電站.要求裝一臺600KW.一臺300KW的發電機組.直接發電上網.能幫忙核算嗎.
Message Time:2005-09-25 11:42:03
Answer:

Name: XRL
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
我的提問請用Email回復
Message Time:2005-09-25 10:09:53
Answer:

Name: XRL
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
請問一臺100KVA的水輪發電機組需多少錢,流量及落差要求;原水輪機與發電機相分離式的小機組如何改造
Message Time:2005-09-25 10:08:30
Answer:

Name: 曾
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
400千瓦的發電機多少錢?水頭高140米。流量0.3立方米。
Message Time:2005-09-24 19:44:16
Answer:

Name: 蘇光輝
Tel: Email:
Theme: 20米的水頭能用沖擊式水輪機嗎?為什么?
Design head(m): 20Maximum head(m) : 25Minimum head(m): 20
Design flow: 0.35Minimum flow: 0.30Meters above sea level(m) : 350Installed capacity: 40
Operation in parallel or not: 是Adress: 架桑電站.山西省夏縣架桑
Your Message:
希望能及時給與回復
Message Time:2005-09-24 12:40:29
Answer:

ReturnFirst PagePrevious PageNext PageLast Page Page:115/154


Contact:Yang Guangping Telephone: (86-833)5544996 13990613689 Fax: (0833)5544996 Email:yanggp@163.com

Address: No. 28, 43 Hongchun Road, Emeishan, Sichuan Province. Zip Code: 614200

贪玩蓝月金币怎么换rmb